Transport and installation of CCT and BBT
Construction of pipelines
Dismantling and transport of 20 CCTs
Construction of water management
Installation of vessels and construction of pipelines in the microbrewery "Plovdiv"
Straightening and positioning of 6 pcs. CCT, serving stairs and walkways
Production of emptying matrix to 2 pcs. Vertical CCT with a volume of 2900 ml.
Preparation of CCT before straightening / laying CIP and drainage pipes; processing of upper flanges of CCT and installation of rotary washing heads
Welding and installation of pipes and reinforcing stands from and to dies and CCT
Repair and welding of kegs
Binding of cooling shirts of 2 pcs. Vertical CCT with a volume of 2900 ml.
Welding and installation of taps and connection tips for sensors
Production and delivery of trays and drainages
Installation of equipment
Production of stainless steel stairs